Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Cha, H S and O’Connor, J T (2005) Optimizing Implementation of Value Management Processes for Capital Projects. Journal of Construction Engineering and Management, 131(02), 239–51.

Darren Graham, L, Smith, S D and Dunlop, P (2005) Lognormal Distribution Provides an Optimum Representation of the Concrete Delivery and Placement Process. Journal of Construction Engineering and Management, 131(02), 230–8.

Dikmen, I, Birgonul, M T and Kiziltas, S (2005) Prediction of Organizational Effectiveness in Construction Companies. Journal of Construction Engineering and Management, 131(02), 252–61.

Elhakeem, A and Hegazy, T (2005) Graphical Approach for Manpower Planning in Infrastructure Networks. Journal of Construction Engineering and Management, 131(02), 168–75.

Hinze, J, Huang, X and Terry, L (2005) The Nature of Struck-by Accidents. Journal of Construction Engineering and Management, 131(02), 262–8.

Kajewski, S L (2005) Multilevel Formwork Load Distribution with Posttensioned Slabs. Journal of Construction Engineering and Management, 131(02), 203–10.

Kazaz, A and Birgonul, M T (2005) Determination of Quality Level in Mass Housing Projects in Turkey. Journal of Construction Engineering and Management, 131(02), 195–202.

Love, P E D, Tse, R Y C and Edwards, D J (2005) Time–Cost Relationships in Australian Building Construction Projects. Journal of Construction Engineering and Management, 131(02), 187–94.

Ping Ho, S (2005) Bid Compensation Decision Model for Projects with Costly Bid Preparation. Journal of Construction Engineering and Management, 131(02), 151–9.

Schexnayder, C, Knutson, K and Fente, J (2005) Describing a Beta Probability Distribution Function for Construction Simulation. Journal of Construction Engineering and Management, 131(02), 221–9.

Shen, L Y and Wu, Y Z (2005) Risk Concession Model for Build/Operate/Transfer Contract Projects. Journal of Construction Engineering and Management, 131(02), 211–20.

Walsh, K D, Sawhney, A and Brown, A (2005) International Comparison of Cost for the Construction Sector: Purchasing Power Parity. Journal of Construction Engineering and Management, 131(02), 160–7.

Zheng, D X M and Ng, S T (2005) Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front. Journal of Construction Engineering and Management, 131(02), 176–86.